Celebrating the topping-out ceremony: Christa Baum (Head of Department BBR), Sebastian Weber (Foreman at the general contractor Zech Hochbau), Brigitte Bourscheidt (Head of Facility Management BImA) and Dr. Florian Pappenberger (Director-General ECMWF) (from left to right). Source: BBR / Tobias Vollmer.
A topping-out ceremony for ECMWF’s new building in Bonn, Germany took place on 20 November 2026, marking an important milestone in the construction of the Centre’s future permanent home in the city. The event coincided with the final structural work on the conference area and the beginning of the next phase of construction.
The ceremony brought together those involved in delivering the new building as well as representatives from German federal, regional and local authorities. ECMWF Director-General Florian Pappenberger joined Brigitte Bourscheidt of the Federal Agency for Real Estate (BImA) and Christa Baum of the Federal Office for Building and Regional Planning (BBR) in recognising the work of the construction teams.
Representatives of Germany's Federal Ministry of Transport, Federal Ministry for Housing, Urban Development and Building, the State of North Rhine-Westphalia, the City of Bonn and the German Meteorological Service also took part.
Construction progressing to the next phase
The scale of the future building is now increasingly visible on the Bonn skyline. In November, the walls of the stairwell core reached the 12th floor, while the ceiling above the ninth floor had been completed. Installation of the first elements of the office tower’s façade started on the lower office floors in early October.
The final structural works are under way in the conference area, allowing fit-out work to begin. Underground infrastructure has also been completed. Under the current schedule, the new facility is expected to be handed over to ECMWF in the second half of 2028.
The latest milestone in the construction is marked by the raising of a topping-out wreath. Source: BBR / Tobias Vollmer.
A new home for collaboration in Bonn
The new building has been designed to provide modern facilities for up to 360 individual workspaces. The complex will comprise a 17-storey office building, a dedicated conference facility and a staff restaurant.
Beyond providing additional office space, the new facility will support ECMWF’s role as an international organisation built on cooperation with its Member and Co-operating States and the European Commission.
At the topping-out ceremony, Florian Pappenberger said: "Our new building in Bonn will be a special place, where international collaboration and scientific excellence will be at the heart of our daily work. With our new headquarters in Reading, our world-class data centre in Bologna, and soon this exceptional workspace in Bonn, we will further improve weather forecasting and climate understanding for the benefit of our Member and Co-operating States and their national meteorological services."
Source: Design: Stefan Lippert Architects / Visualization: Render Vision
ECMWF became a multi-site organisation in 2021, with its headquarters in the United Kingdom, data centre in Bologna, Italy, and offices in Bonn. Germany’s proposal for Bonn was selected through competition in 2020.
The Bonn duty station officially opened in September 2021, initially in interim offices. The new purpose-built facility will provide ECMWF with its permanent home in Bonn and represents a further step in the Centre’s long-term multi-site strategy.