Forecasting System upgraded to Cycle 25r1 9 April 2002 ECMWF upgraded the Operational Forecasting System to Cycle 25r1.
Forecasting System upgrade to cycle 24r3 22 January 2002 ECMWF upgraded the Operational Forecasting System to Cycle 24r3.