TY - RPRT AU - J.M. Sabater AU - Patricia de Rosnay AU - Anne Fouilloux AU - M. Dragosavac AU - A. Hofstadler AB - Contracted by the European Space Agency (ESA), the European Centre for Medium-Range Weather Forecasts (ECMWF) is involved in global monitoring and data assimilation of the Soil Moisture and Ocean Salinity (SMOS) mission data. To this end ECMWF has developed the Community Microwave Emission Model as the passive microwave forward model operator to simulate brightness temperatures (TB). ECMWF has also developed a series of fortran routines and shell scripts which makes it possible to interface SMOS data in the Integrated Forecast System (IFS) of ECMWF. The technical implementation of the IFS interface will permit the monitoring of SMOS TB over land and sea. This report is the Part 2 of the first Milestone Technical Note / Progress Report of the ESA Request for Quotation RfQ 3-11640/06/I-LG. It provides technical documentation of the IFS interface with SMOS data. BT - ESA/ESRIN Contract 20244/07/I-LG C1 - Research CY - Shinfield Park, Reading DA - 11/2009 LA - eng M1 - 2009:ESA Contract 20244/07/I-LG N2 - Contracted by the European Space Agency (ESA), the European Centre for Medium-Range Weather Forecasts (ECMWF) is involved in global monitoring and data assimilation of the Soil Moisture and Ocean Salinity (SMOS) mission data. To this end ECMWF has developed the Community Microwave Emission Model as the passive microwave forward model operator to simulate brightness temperatures (TB). ECMWF has also developed a series of fortran routines and shell scripts which makes it possible to interface SMOS data in the Integrated Forecast System (IFS) of ECMWF. The technical implementation of the IFS interface will permit the monitoring of SMOS TB over land and sea. This report is the Part 2 of the first Milestone Technical Note / Progress Report of the ESA Request for Quotation RfQ 3-11640/06/I-LG. It provides technical documentation of the IFS interface with SMOS data. PB - ECMWF PP - Shinfield Park, Reading PY - 2009 T2 - ESA/ESRIN Contract 20244/07/I-LG T3 - ESA Contract Report TI - Milestone 1 Tech Note - Part 2: IFS Interface ER -